Production Schedule
Production Schedule
Current Production Schedule
START DATE:
September 3, 2024 thru September 23, 2024
Scheduling Your Build
Down Payment of $84,900.00 USD
Down Payment Guarantee's Your Ultralight On/Off Grid Solar Cabin Will Begin Construction Within the Current 3 Week "Start Production Slot" Available At Time Down Payment IS Received.
There Are Three Phases To Constructing Your Ultralight Solar Cabin.
The First Phase Is a Three Week Fulfillment Slot
Upon Verification of Down Payment,
Our Purchasing Staff Will Immediately Begin Ordering All Required Materials and Equipment(trailer, construction materials, appliances, solar, mechanical's, etc.).
.
The Second Phase is Our Fourteen Week Fabrication and Construction Slot Your Down Payment Secures
Due To The Light Weight Design Of Your "Wood Frame" Ultralight Solar Cabin, All of the Structural Components Needed to Construct Your Ultralight Solar Cabin Must Be Fabricated Within Our Facility.(you can't buy them, because nobody else makes them!)
Once All Of The Structural Components Have Been Fabricated, The Actual Construction Process Will Begin.
.
The Third Phase Is A Two Week "Shake Down" Inspection and Testing Period
All Of The Components Integrated Into Your Ultralight Solar Cabin Will Be Brought To Life And Undergo A Thorough And Detailed Inspection Including a Two Week 24/7 Full Power All Systems Testing Period. Any Issues Will Be Rectified and Thoroughly Tested Before Your Ultralight Solar Cabin Is Certified Ready For Delivery.